My long term plan is to have 4" of the compacted gravel screenings base topped with brick or some other kind of paver the same thickness as brick. So the fill will be 6" thick to begin with. The fill will have a year to settle and then when I get ready to lay the pavers, I will shave off the top of the gravel and re-grade to accommodate the pavers. I will have the excess gravel for some other area and the base will have excellent compaction.
Urban essay: A landscape, grounds keeping photo journal of transforming a weed lot into a garden. A "How we are doing it from scratch" web log. Topics include: grounds keeping, gardening, planning, landscape construction design, materials, equipment and supplies. Tools for lawn and turf care, tools for gardening, tools for landscape construction, and tool maintenance. Sources for tools and equipment, product evaluations and price comparisons. Garden project cost accounting.
Thursday, May 20, 2010
Next Project
My long term plan is to have 4" of the compacted gravel screenings base topped with brick or some other kind of paver the same thickness as brick. So the fill will be 6" thick to begin with. The fill will have a year to settle and then when I get ready to lay the pavers, I will shave off the top of the gravel and re-grade to accommodate the pavers. I will have the excess gravel for some other area and the base will have excellent compaction.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment