I cut up the sod and removed it. Then I loosened the soil 3"-4" deep with the spade. I shoveled out the soil and wheeled it around back by the compost area for processing. I had a good sized pile. There I screened about half of the soil through the medium screen to cull the stones and clods and wheeled the good soil back to the site. I dumped the soil in the excavation, raked it out and tamped it down. When I was satisfied with the grade I put the sod back and watered it. I put two loads of gravel in the area where there is a chunk of side walk missing. I gently raked the soil up to it, and laid the sod over it. The water drained right off when I rinsed the side walk off.
I got about 1/3rd of this part of the project done. I plan to take up in the morning where I left off today . Maybe now that I have a system I will get the remaining 2/3rds done in the time it took for me to do the 1/3rd. I hope this improvement will suffice until the city comes through and repairs the sidewalk so's it will properly drain. Maybe that will happen within five years.
No comments:
Post a Comment